Dec 282015
 

We’re coming up on the end of 2015.  I had high hopes of getting more finished this year but all things considered, things are moving along.  It shouldn’t be too long and our new garage with workshop will be finished which will allow me to layout imaging systems somewhere other than in our bedrooms….  From there, I hope to get the Exploradome up and running in 2016 with the OGS 10″ RC and U16 acting as the workhorse imaging system.

 

Digging out a few large stumps

Digging out a few large stumps

Aerial view of the observatory site.  Needs a lot of cleanup.

Aerial view of the observatory site. Needs a lot of cleanup.

Testing the OGS 10" RC

Testing the OGS 10″ RC

Leave a Reply